Our Work

HVAC installation and service for Schools in North Alabama including Decatur and Huntsville School Systems


  • Alabama Center for Excellence in Clean Energy Technology
  • Alabama Center for Excellence in Clean Energy Technology
  • Alabama Center for Excellence in Clean Energy Technology
  • Alabama Center for Excellence in Clean Energy Technology

Alabama Center for Excellence in Clean Energy Technology

  • Owner: Calhoun Community College
  • Contract Amount: $914,431

This project is a teaching lab for students and includes several different systems for that purpose. It has geothermal – water source heat pumps, DX split systems and exhaust fans. The new plumbing system uses clean energy and rain water for non-potable water.

  • New Hartselle High School/HVAC
  • New Hartselle High School/HVAC
  • New Hartselle High School/HVAC
  • New Hartselle High School/HVAC

New Hartselle High School/HVAC

  • Owner: Hartselle City Board of Education
  • Contract Amount: $6,595,299.00

This is a replacement school for the existing Hartselle High School. The mechanical system consists of condenser water piping, cooling towers, boilers, classroom water source heat pumps, rooftop water source heat pumps, and ERV units.

  • Old Hartselle High School/Mechanical Replacement
  • Old Hartselle High School/Mechanical Replacement
  • Old Hartselle High School/Mechanical Replacement
  • Old Hartselle High School/Mechanical Replacement

Old Hartselle High School/Mechanical Replacement

  • Owner: Hartselle City Board of Education
  • Contract Amount: $893,000.00

This project is the renovation of the old Hartselle High School which requires a complete demolition of the existing mechanical system. This renovated school receives new gas rooftop units and curb replacements on the classroom portion of the building.

  • UAH University Center Lower Level Renovation
  • UAH University Center Lower Level Renovation
  • UAH University Center Lower Level Renovation

UAH University Center Lower Level Renovation

  • Owner: Huntsville City Board of Education
  • Contract Amount: $516,573.00

This project is a renovation of the basement level of University Center with new chilled water/hot water fan coil units and air handling units.

  • New School Building for Phil Campbell High School
  • New School Building for Phil Campbell High School
  • New School Building for Phil Campbell High School
  • New School Building for Phil Campbell High School

New School Building for Phil Campbell High School

  • Owner: Franklin County Board of Education
  • Contract Amount: $1,736,205.00

This school is a replacement of one of the schools destroyed during the 2011 Tornado Outbreak. It consists of DX split systems serving the gym and classrooms. It also has ERVs and wall mount units serving classrooms.

  • Huntsville High School Freshman Academy-Phase II
  • Huntsville High School Freshman Academy-Phase II
  • Huntsville High School Freshman Academy-Phase II
  • Huntsville High School Freshman Academy-Phase II

Huntsville High School Freshman Academy-Phase II

  • Owner: Huntsville City Board of Education
  • Contract Amount: $1,798,950.00

This project is a new 2 story building that has condenser water piping, new cooling towers, hot water piping, boilers, pumps, and classroom water source heat pumps. The makeup air units are located on the roof.

  • Calhoun Welding Ventilation System
  • Calhoun Welding Ventilation System
  • Calhoun Welding Ventilation System
  • Calhoun Welding Ventilation System

Calhoun Welding Ventilation System

  • Owner: Decatur City Board of Education
  • Contract Amount: 219,453.50

This project is a classroom building for welding students. New ventilation, welding hoods, and exhaust hoses are being added to existing welding labs.

  • Decatur High School-Culinary Arts Renovation
  • Decatur High School-Culinary Arts Renovation
  • Decatur High School-Culinary Arts Renovation
  • Decatur High School-Culinary Arts Renovation

Decatur High School-Culinary Arts Renovation

  • Owner: Decatur City Board of Education
  • Contract Amount: $208,900.00

As the general contractor, we are adding a completely new kitchen for the Culinary Arts class. This project includes new plumbing, electrical, architectural work, kitchen/grease hood, and rework of the existing rooftop HVAC unit.

Ed White Academy of Academics & Art Renovation

Ed White Academy of Academics & Art Renovation

  • Owner: Huntsville City Board of Education
  • Contract Amount: $2,543,358.11

This project is a complete renovation of the existing school including demolition of the existing mechanical system. The mechanical system consists of a new chiller, boilers, pumps, rooftop air handling units, and VAV system. The hot and chilled water runs throughout the building and on the roof.

  • University of Alabama-Student Services Building
  • University of Alabama-Student Services Building
  • University of Alabama-Student Services Building
  • University of Alabama-Student Services Building

University of Alabama-Student Services Building

  • Owner: University of Alabama in Huntsville
  • Contract Amount: $1,938,396.00

This project is a 3 story building for Student Services. The hot and chilled water ties onto underground water lines that run from the Central Chiller plant to the mechanical room. The air handling units on the roof serve all the floors and the hot water serves VAV boxes located on every floor.

Martin Luther King, Jr. Elementary-Additions & Renovations

Martin Luther King, Jr. Elementary-Additions & Renovations

  • Owner: Huntsville City Board of Education
  • Contract Amount: $831,551

This project consists of a complete plumbing and mechanical demolition for the existing school. New gas rooftop units serve the existing school and an addition. New plumbing fixtures are being added to the existing and new plumbing system for the addition.

  • Morris P-8 School
  • Morris P-8 School
  • Morris P-8 School
  • Morris P-8 School
  • Morris P-8 School

Morris P-8 School

  • Owner: Huntsville City Board of Education
  • Contract Amount: $3,174,393

Morris P-8 is a new school that replaces the existing Morris Elementary School. The HVAC system consists of condenser water piping, hot water piping, and cooling towers. The classrooms are served by water source heat pumps. The makeup air units are located on the roof along with the gas rooftop units.

  • UAH Chiller Plant Expansion
  • UAH Chiller Plant Expansion

UAH Chiller Plant Expansion

  • Owner: University of Alabama in Huntsville
  • Contract Amount: $330,000

This project is an addition to the existing Central Chiller Plant. A new 500-ton chiller is being added to the plant. The chilled water lines are tied into the existing chilled water.

  • New Decatur High School
  • New Decatur High School
  • New Decatur High School
  • New Decatur High School

New Decatur High School

  • Owner: Decatur City Board of Education
  • Contract Amount: $5,115,650

This project is a replacement school for the existing Decatur High School. The mechanical system consists of new chillers, boilers, pumps, rooftop air handling units, and VAV systems. The hot and chilled water runs throughout the building. There is also a VRF system and many ductless split systems.